Technical Highschool Esch sur Alzette (Lallange)

Project Details

Year: 2010
Architects: Pawloski – Lutz †
Owner: Ministry of Public Works
Total surface area: +- 41,000 m²
Built volume: +- 200,000 m³
Total investment cost: +- 100 million euros
Design time: 2003 – 2006
Time to completion: 2007 – 2010

Description

The project includes :

  • construction of the steel frame and reinforced concrete structures,
  • conversion of the existing swimming pool and sports hall (± 4000 m2),
  • external works, including the rerouting of a gas pipeline.

The engineer’s mission includes :

  • preliminary design studies,
  • execution project,
  • preparation of tender documents,
  • preparation of detailed comparative tables, analysis of bids and reasoned proposals for award,
  • monitoring of execution.

It should be noted that this is a “high energy efficiency” building.